Sunday, October 17, 2010

How Much For 1969 Premium Savings Bond ?

13th Floor Part 2 October - formwork walls

As far as the ceiling was dry now, was started with the formwork for the walls upstairs. These are concrete floor to the knee and then the brick gable.

was also still the strip foundation for the staircase, terrace and car port dredging and our slot was filled. Florian took it from the bulldozer drivers the most work.

The pump looked quite taken off, but it has served us well.



0 comments:

Post a Comment