has hardly shown the thermometer above 0 ° Celsius Walter was on the construction site and got down to the raw installation for the electrical system. Now - mid-January - is almost all done. Only the top floor is still missing.
weekend was the first conversation with our installer and it turned out, the probably come to some problems for us, but that I will tell you later ....
Here are some photos from inside
entrance with view of the toilet door ;-)
bedroom (behind me Space for the spatially separated in closet, but not everything that fit on the photo ;-))
view from the bedroom to the patio (courtyard) and across to the bathroom (the niche left behind the shower)
And now from the other side: view from the bathroom into the bedroom
kitchen
dining
living area (which is of course larger, but unfortunately I habs bad shot ...)
From the basement there's no picture today - there's nothing interesting and it's quite dark ;-)
0 comments:
Post a Comment