Monday, January 17, 2011

Football Running Back Camps

December / January 2011 - Electric raw installation

has hardly shown the thermometer above 0 ° Celsius Walter was on the construction site and got down to the raw installation for the electrical system. Now - mid-January - is almost all done. Only the top floor is still missing.

weekend was the first conversation with our installer and it turned out, the probably come to some problems for us, but that I will tell you later ....

Here are some photos from inside

entrance with view of the toilet door ;-)


bedroom (behind me Space for the spatially separated in closet, but not everything that fit on the photo ;-))


view from the bedroom to the patio (courtyard) and across to the bathroom (the niche left behind the shower)


And now from the other side: view from the bathroom into the bedroom


Bed and Breakfast (is only 10 meters - which one gets ill on image)


kitchen



dining



living area (which is of course larger, but unfortunately I habs bad shot ...)


And my absolute favorite room - the floor (next to the front is my job and the right of Max)


From the basement there's no picture today - there's nothing interesting and it's quite dark ;-)

0 comments:

Post a Comment